Install the hardware

Mount and wire the kit, then prove it works before the first job. A first Full Automation or Guidance Only install takes about an hour; moving the kit to another machine takes as little as 20 minutes.

  • Full Automation Kit
  • Guidance Only Kit
  • DIG™ Kit

These pages take you through fitting a Ditch Assist® Full Automation Kit or Guidance Only Kit on a tractor and implement, one part at a time. Each page lists what you need, gives one job per step and tells you what you should see before you move on.

The DIG™ Kit for excavators has its own pages at the bottom of this one. Ditch Assist Lite needs no install: the Emlid Reach goes on the implement and talks to the tablet over its own Wi-Fi. See Ditch Assist Lite.

Before you start

  • The kit box, opened and checked against What's in the kit
  • The tractor and implement parked on level ground, with room to walk all the way round
  • The tablet, with the Ditch Assist app installed (Install the app)

Time: about an hour for a first install. Moving the kit to another machine later takes as little as 20 minutes.

Tools

  • A wrench that fits the nuts on the tractor battery terminals
  • Wrenches that fit the hydraulic fittings (Full Automation Kit)
  • Bolts and clamps, or a welder, to fix the valve bracket (Full Automation Kit) and an antenna mast if you need one
  • Cable ties
  • A piece of cardboard, to look for oil leaks
  • A tape measure, if you will measure blade height by hand

The order of work

  1. Check what's in the kit

    Lay every part out and tick it off. What's in the kit

  2. Connect the power harness to the battery

    Power harness

  3. Fit the hoses to the valve and mount it

    Full Automation Kit only. Valve

  4. Mount the Control Module

    Control Module

  5. Connect the hoses to the tractor

    Full Automation Kit only. Hydraulic hoses

  6. Mount the GPS antenna on the implement

    GPS antenna

  7. Mount and power the tablet

    Tablet mount

  8. Connect all the cables

    Seven connections, then seal the two spare ports. Connect all cables

  9. Connect the tablet and test raise and lower

    The raise and lower test is for the Full Automation Kit. Connect and test

Where everything goes

Typical install on a pull-type scraper Side view of a tractor pulling a scraper. 1: the valve on the scraper tongue. 2: the Control Module on the tongue, in sight of the cab. 3: the GPS antenna on a mast on the scraper, so it rises and falls with the cutting edge and stays above the frame when fully lowered. 4: the power harness runs straight to the tractor battery. 5: the four hoses run from the valve to the tractor's rear remotes, with slack at the hitch. 12345

A typical install on a pull-type scraper:

  1. Valve on the tongue (Full Automation Kit).
  2. Control Module on the tongue, in sight of the cab.
  3. GPS antenna on a mast on the implement, so it moves up and down with the cutting edge.
  4. Power harness straight to the tractor battery.
  5. Hoses from the valve to the tractor's rear remotes, with slack at the hitch.

More, including a land leveler: Typical installations.

All hardware pages

Full Automation and Guidance Only Kits

DIG™ Kit (excavators and backhoes)

Did this answer your question?

Still stuck? Talk to a product specialist. 1-833-DITCH-AS · support@ditchassist.com · Monday to Friday, 8 a.m.–5 p.m. Central.

Calling about a problem? Send your app logs first so support can see what happened.