Surveying channel and berm
Terracing chapter of the Ditch Assist app manual. The same text is in the app under Manual.
In the app Manual › Terracing › Surveying channel and berm
The wizard walks you through both surveys back-to-back.
Channel survey:
- Drive to the planned channel start (one end of the terrace).
- Tap Start in the survey sidebar.
- Drive the channel centerline at a steady pace.
- Tap Stop at the far end.
- Name the channel survey (e.g. "Terrace 12 channel"). Save.




Berm survey:
- The wizard prompts for the berm. Drive to the planned berm centerline (parallel to the channel).
- Tap Start.
- Drive end-to-end.
- Tap Stop, name (e.g. "Terrace 12 berm"), save.


Loading saved surveys
If you already surveyed both halves on a previous trip, choose Load in the wizard. A picker dialog asks you to select the channel survey first, then the berm survey. Both must be present for the design dialog to open.
A common mistake
The berm survey should be on the downhill side of the channel. If your terrace is designed to catch water and direct it sideways, the channel sits uphill and the berm is built on the downhill side. Surveys done on the wrong side give nonsense fill volumes — review the chart in the design dialog before applying.
Did this answer your question?
Thanks. That tells us which pages to improve.
Still stuck? Talk to a product specialist. 1-833-DITCH-AS · support@ditchassist.com · Monday to Friday, 8 a.m.–5 p.m. Central.
Calling about a problem? Send your app logs first so support can see what happened.